General waste incinerator with automated feeding system

a. be based on common, well-proven and clean technology – both as a complete unit and in terms of its individual components.  b. be very robust, sturdy and capable of installation in remote locations subject to severe conditions.  solid waste incinerator for medical waste disposal china incinerators Principle Medical Waste Incineration Treatment Burn Rate Average 1000-1500 kg/hour Feed Capacity Average 6000kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 4800Liter  Internal Dimensions 400*120*100 cm d. generate residual incinerator ash conforming to <10% by volume and <25% by weight of the waste incinerated.  “• Heavy steel construction.The proposed incinerators shall be able to be completely packed into a series of 20ft export standard sea containers. • Fixed hearth geometry and starved air gasification operational mode.  • Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm.  …

What are the objectives of incineration?

What are the objectives of incineration? Incineration plants produce heat and power from waste, reduce waste disposal to landfills, and discharge  harmful emissions and bottom ash. The objective of the incineration plant is to maximize desirable outputs  (heat and power) and minimize undesirable outputs (emissions and bottom ash).   What is incinerators used in hospitals? Medical incinerators are designed safely to dispose of harmful materials at high temperatures. The process  ensures no harmful gases are released into the environment. Medical waste incinerators have scrubbers to  clean the polluted gases and other particulate matter. Which is better landfill or incineration? Its director Jacob Hayler told us: “It is better to recover energy from non-recyclable waste through (incineration), than send it to landfill.” … Mr Hayler says that overall greenhouse  gas emissions from incineration are lower than from landfill. How does incineration affect our environment? Pollutants emitted by incinerators that appear to have the potential to cause the largest health effects are  particulate matter, lead, mercury, and dioxins and furans. However, there is wide variation in the contributions  that incinerators can make to environmental concentrations of those contaminants.       Nanjing Clover …

Pet Crematory HICLOVER A600

Model A600, crematorium manufacturers Internal Dimensions 130 x 70 x 65cm Suit for Animal Cat – yes Dog – yes Pig …

Medical Incinerator Manufacturers in Stock ready for shipping

Medical Waste Incinerators in Stock. Twitter: https://twitter.com/hiclovercom Phone/WhatsApp/Wechat: +8613813931455, Web: www.hiclover.com Web: www.clover-incinerator.com Double Combustion Chamber,Double Italy Burner,Smoke Filter Included,Burning Rate: …

Three ply Disposable Surgical Breathing mask machine

Zhangjiagang Tengxiang Machinery Co., Ltd. Mobile: 0086-13962221749(whatsapp) Wechat: chncheumg Email: zhangzhonghua@txmc.com.cn  平面口罩机参数: Semi-Automatic Mask Machine l Power supply: 3.3KW mono phase l Mask Size: …

MEDICAL/BIOLOGICAL WASTE INCINERATOR

SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE  INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the  atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the  chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire  hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator …

Double chamber incinerators

Construction   Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent                                                                 Refractory material liningLength 10 m above groundBore about 350mm diameterDischarge temperatures          About 850 0CEmissions   To comply with standards in section 9 of third schedule of the waste management regulations, 2006.    3.5       Electrical System   Control unit                                 Fully automatic with microprocessor based control                                                                      unit (PLC) automating all operations of the                                                                      incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progressParameters  i.e. temperature of primary and secondary chambers, turbulence and timeWith status lampWith user of defined and differed programmed operating cycles for different type of loads/conditionsWith safety interlocks, display of errors and visible and audio alarms.System for continuous  emission monitoringIsolator switch                               Supply and install isolator switch 240V, 100A for the                                                                    incinerator unit, including all necessary cables 10mDistribution Board Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.Wiring Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                       Working length 20m.  Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulationsFuel System                                    Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)                                                                 Fuel Tank                                         Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance materialFuel type DieselFuel Lines                                        Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.                                                                         Working length , 20mFuel pipe material; Special copper pipes or similar                                                                        and approved materials